In 2010, ABO Energy Ireland commissioned the first wind farm the team planned and constructed in Gortahile, County Laois. It consists of eight Nordex N90 turbines with a hub height of 80 metres and a total capacity of 20 megawatts.
ABO Energy Ireland Limited
Tel. +353 1 207 0452